Pittsburgh’s light rail expansion project dubbed the North Shore Connector Project has passed underneath the Allegheny River despite some earlier troubles. The cut and cover tunnel portion is complete, and the TBM bored portion of the tunnel is is approximately 80% complete. There is a short video and more details at the Pittsburgh Post-Gazette. (Photo by Bob Donaldson/Post-Gazette)
Related Articles
Conceptual Plan for Excavation to Repair Bertha TBM
April 10, 2014
rockman
Project Related
Comments Off on Conceptual Plan for Excavation to Repair Bertha TBM
Landslide on Route 30 in East Pittsburgh
April 11, 2018
rockman
Geologic Hazards, News
Comments Off on Landslide on Route 30 in East Pittsburgh
Riverbank Filtration Tunnel and Pump Station in Louisville, KY Wins 2011 ASCE Award
April 13, 2011
rockman
Project Related
Comments Off on Riverbank Filtration Tunnel and Pump Station in Louisville, KY Wins 2011 ASCE Award