Related Articles
Lateral Load Testing of Drilled Shafts For Cable Barriers – ADSC Study
June 25, 2009
rockman
Project Related
Comments Off on Lateral Load Testing of Drilled Shafts For Cable Barriers – ADSC Study
Pond Embankment Stabilization with Geopolymer Injection
December 10, 2014
Ty Taylor
Articles, Ground Improvement
Comments Off on Pond Embankment Stabilization with Geopolymer Injection
[Editor] An effluent pond in southeast Texas was suffering from years of erosion. Recently, an escalation of subsurface water seepage through the pond’s embankment threatened the community’s main water source. URETEK used their versatile geopolymer product to inject beneath the embankment to seal off the seepage. The project was a huge success! Read on for this contributed article from GeoPrac sponsor URETEK ICR. [/Editor]
Texas Hi-rise To Be Demolished After 16-in of Settlement
September 23, 2009
rockman
Failures
Comments Off on Texas Hi-rise To Be Demolished After 16-in of Settlement