A nifty BIM-type view of the proposed bored tunnel for Washington SR 99, the tunnel to replace the aging Alaskan Way Viaduct along Seattle’s waterfront. It’s pretty neat to see the piles and foundations for other structures and major utilities as the bore passes by them. A little on the longer size, at around 5 minutes.
Related Articles
Seattle Light-Rail Tunnel Likely to Break Ground This Year
Thanks to approximately $100 million from President Bush’s proposed 2009 budget, the $1.8 billion project creating a light-rail line from downtown Seattle to the University of Washington is likely to break ground some time this year. The project will involve twin bored tunnels on the order of 3 miles in length. It is scheduled to open for use in 2016.
There is another notable tunnel project associated with the Seattle Light Rail, known as the Beacon Hill tunnel which I have blogged about before.
Blasting for NY subway construction showers street with debris
NovoLAB Introduction Video
NovoLAB is a geotechnical data management software designed for processing soil laboratory test data and preparation of boring logs. NovoLAB generates the boring logs and tests summary automatically. By GeoPrac sponsor Novotech Software. [Source: YouTube. […]