About two-thirds of a 57-km-long “fence” of sheet piling has already been driven to encircle polluted industrial sites in Porto Marghera that flow into a 550-sq-kilometer lagoon. [Source: ENR: Engineering News Record. Image: Peter Reina, ENR]
Related Articles
APE develops Helical Pile systems
Well-known pile hammer manufacturer APE has purchased technology for driving and coupling large diameter helical piles that could help make this technology more mainstream. Rather than pounding the pile into the ground, the steel drill […]
Paper on Underwater Noise Reduction of Marine Pile Driving
January 6, 2017
rockman
Available Resources
Comments Off on Paper on Underwater Noise Reduction of Marine Pile Driving