The current edition of the AASHTO LRFD Bridge Design and Construction specifications do not have specifications for soil nail retaining walls. This TRB publication is meant to be an interim solution for agencies who still wish to take advantage of the advantages of soil nail retaining walls for certain situations. [Source: TRB. Image: TRB]
Related Articles
TRB Webinar: Visualization of Geotechnical Data for Hazard Mitigation and Disaster Response, a Practical Update
June 30, 2016
rockman
Available Resources
Comments Off on TRB Webinar: Visualization of Geotechnical Data for Hazard Mitigation and Disaster Response, a Practical Update
TRB will conduct a webinar on Wednesday, July 20, 2016 from 2:00PM to 3:30PM ET that features research from National Cooperative Highway Research Program (NCHRP) Synthesis 467: Visualization of Geotechnical Data for Hazard Mitigation and […]
Using the Existing Pavement In-Place and Achieving Long Life
June 11, 2013
rockman
Available Resources
Comments Off on Using the Existing Pavement In-Place and Achieving Long Life
TRB’s second Strategic Highway Research Program (SHRP 2) Renewal Project R23 has released a prepublication, non-edited version of a report titled Using the Existing Pavement In-Place and Achieving Long Life that describes a procedure for […]