In this 2007 ENR article, a drilling superindtendent from Case Foundation, Rob Jones, is profiled while his company works on the foundations for a Chicago highrise. As a geotechnical engineer who designs drilled shaft foundations, I found it very interesting to learn more about the guys on the construction end of drilled shafts. There is no question in my mind that those guys work a lot harder than I do. [Source: ACE Mentor Program. Image: ENR]
Related Articles
Drilled Shaft Rig Topples in Austin, Texas [Video]
An excavator mounted drill rig drilling shafts as part of a project to pass utilities under I-35 near 51st Street toppled over while trying to move in soft, rain soaked soil. The Austin Fire Department was able to extract the operator from the cab and he was taken to a local hospital with minor injuries, a minor miracle. I’m not sure what the purpose of the drilled shafts were for. Since the project was for some kind of utility pipe jacking under the freeway, I’m speculating it was drilling holes for temporary shoring for the jacking pit or something along those lines. I’m sure OSHA will be looking into the incident. Video news story after the break. (Photo from Austin KXAN.com).
Video: iPad used for day-to-day operations of Chicago area ready-mix plant
DFI Announces the 2012 Outstanding Project Award Winner – The Route 9A Pedestrian Tunnel at the World Trade Center
Hawthorne, NJ (December 1, 2012): The Deep Foundations Institute (DFI) presented the 2012 Outstanding Project Award (OPA) to the Port Authority of New York and New Jersey for the design and construction of the Route 9A Pedestrian Tunnel at the World Trade Center in New York City. The award was presented to Robert Yin of the Port Authority of New York and New Jersey at the Awards Banquet during DFI’s 37th Annual Conference on Deep Foundations in Houston.
[Editor] Read on for the rest of the press release from DFI. [/Editor]