US Wick Drain of Leland North Carolina recently completed the world’s largest marine barge wick drain installation…over 12 MILLION linear feet. The wick drains will allow timely consolidation of marine sediments supporting dikes for the new Craney Island Port in Norfolk, Virginia. The equipment was installed with APE wick drain installation machines through steel pipe-lined holes in the barge. Engineers predict 21 feet of settlement once the wick drains are preloaded. [Source: APE News via National Driller. Image: APE News (Backus Aerial Photography)]
Related Articles
Seminars in VA on Helical Foundation Systems, Helical Soil Nails & Push Piers
Historic Brewery Restored With Help of Geopolymer
Turning a 119 year old brewhouse into a four-star boutique hotel is no easy task. For the project to be a success, the structure had to literally be raised from it’s grave.
Pearl Brewery operated from 1883 until 2001 in their downtown San Antonio, Texas location. It was once the largest brewery in Texas, and even kept afloat during the Prohibition era. Today the 22- acre Pearl site grounds has become a culinary gathering place where you can eat, live, learn, and play on the banks of the San Antonio River.
Renovating the original building would be no easy task for the developer. The building had settled approximately 5 inches. URETEK ICR successfully used their patented URETEK Method® to lift and stabilize the foundation with geopolymer.
[Editor] Read on for the rest of the contributed article from Ty Taylor of GeoPrac.net sponsor, URETEK ICR [/Editor]