Video: URETEK Stabilizes Sinking Railroad

After saturated conditions weaken a 3 foot thick concrete base under a long span of rail track, URETEK crews work in tight conditions with over 12,000 volts buzzing overhead to stabilize the compromised track using structural grade polymer. www.uretekicr.com