Scour at Bridge Foundations on Rock

Scour at Bridge Foundations on Rock

Scour at Bridge Foundations on Rock

TRB’s National Cooperative Highway Research Program (NCHRP) Report 717: Scour at Bridge Foundations on Rock presents a methodology for estimating the time rate of scour and the design scour depth for a bridge founded on rock. The report also includes design and construction guidelines for application of the methodology. [Source: TRB. Image: TRB]