Blasting for the New York MTA’s Second Avenue Subway project unexpectedly showered the street level with debris, damaging buildings. Fortunately there were no injuries. Some debris reached the height of a 5 story building. [Source: WSJ.com via ASCE SmartBrief. Image: WSJ.com]
Related Articles
New Tunnel Project In Peru Through Andes
From ENR:
In the mountains of Peru a tunnel-boring machine named “Pacha Mama†is grinding through the heart of the Andes under rock as deep as 6,890 ft. It is carving away at a 20.2-kilometer-long tunnel through the South American Continental Divide to deliver water to arid coastal farmland.
This is a really interesting project, known as the Los Olmos project, and a nice little article. Normally for a civil tunnel project you drill geotechnical holes beforehand to know what kind of material you’re dealing with. In this case, because of the depth, they don’t have that luxury, so all decisions will be made on the fly. The depth of the tunnel creates some very challenging rock mechanics and logistics problems as well! (Illustration by Odebrecht)
Lovat TBM breakthrough imminent at Brightwater
Pittsburgh PA Light Rail Tunnel Construction and Cost Overruns
The Port Authority of Allegheny County (Pittsburgh, Pennsylvania) has a major transit improvement project dubbed the North Shore Connector. Its main components are twin bored tunnels 1.2 miles long that will connect the Port Authority’s Light Rail Transit system, the T, 1.2 miles from the Gateway Subway Station underneath Stanwix Street and the Allegheny River to the North Shore. It will travel under the river and provide three new stations and allow for future improvements beneficial to future development and continued downtown revitalization. The $435 million project is making news recently for cost increases, drawing comparisons to Boston’s Big Dig much to the dismay of the Port Authority. Read on for project maps, links and more info.