Leo Frigo Bridge in Green Bay, Wisconsin Pier Settles
Pier 22 of the Leo Frigo Bridge settled 22 to 27 inches last week causing a 400 foot long segment of the bridge to sag dramatically, forcing the closure of the bridge. There were no […]
Pier 22 of the Leo Frigo Bridge settled 22 to 27 inches last week causing a 400 foot long segment of the bridge to sag dramatically, forcing the closure of the bridge. There were no […]
Copyright © 2007-2020 by Randy Post