About two-thirds of a 57-km-long “fence” of sheet piling has already been driven to encircle polluted industrial sites in Porto Marghera that flow into a 550-sq-kilometer lagoon. [Source: ENR: Engineering News Record. Image: Peter Reina, ENR]
Related Articles
Under pressure: raising Venice above water (using… water?)
January 26, 2012
rockman
Geologic Hazards
Comments Off on Under pressure: raising Venice above water (using… water?)
APE Pile Driving and Helical Pile Introduction Video
March 10, 2014
rockman
Available Resources
Comments Off on APE Pile Driving and Helical Pile Introduction Video