Coastal erosion is threatening existing structures at Shell Beach and northern Pismo Beach near San Luis Obispo, California. The Army Corps of Engineers suggests 6 sea walls to protect infrastructure such as two sewage treatment facilities, Highway 101, Price Street, drainage structures and to preserve building setbacks. [Source: SanLuisObispo.com via ASCE SmartBrief. Image: SanLuisObispo.com]
Related Articles
U.S. Army Corps of Engineers, New Orleans District to Implement Dataforensics PLog Enterprise for Geotechnical Data Management
Norcross, GA, July 6, 2009 – The U.S. Army Corps of Engineers, New Orleans District (USACE – NO) has issued a contract to Dataforensics, a leader in geotechnical data management software development and implementation, for its PLog Enterprise software. The contract not only includes deployment of the PLog Enterprise system but expanding its capabilities to work with Oracle databases and with ArcSDE technology. [Editor] Click through for the rest of the press release. [/Editor]
Teenage Girl Buried Alive in Beach Bluff Landslide
A teenage girl strolling on the beach in Pacifica, California was buried alive by a landslide. She was buried up to her chest, and a passer-by dug her out with his bare hands while more soil and rock fell around them. Story at KTVU San Francisco. See a nice oblique aerial photo of the beach prior to the landslide here. Those slopes don’t look particularly stable to me but what do I know?
New Orleans Levees Need to be Raised 11-ft
The US Army Corps of Engineers has issued a report that indicates the eastern portion of the levee system that protects Bernard Parrish will need to be raised by 11-ft to 29-ft to protect against the 100-year hurricane. Levees along Lake Pontchartrain were designed in the 1960s for what was then considered to be 200-yr and 300-yr hurricanes. Now they are judged sufficient for the 100-yr event. More at NOLA.COM.