California Governor Jerry Brown announced this summer that the state will move forward with plans for two multi-billion dollar water supply tunnels. Twin 56-km long (35 miles) tunnels will be constructed to convey water from the Sacramento River south to an existing aqueduct that serves the San Joaquin Valley and Southern California. [Source: World Tunnelling. Image: Rich Pedroncelli via KTVU.com]
Related Articles
Devil’s Slide Breakthrough Video and Links
The “breakthrough” media event for CALTRANS’ Devil’s Slide Tunnel project was this past Friday. A large crowd of politicians, news crews and locals were on hand as a road-header broke through a shotcrete face in a ceremony to mark the completion of the excavation portion of the first of two tunnels. It will still be over a year until the tunnels are opened to traffic. The second tunnel is expected to breakthrough as early as this week. (Photo by SFGate.com)
Caltrans tunnel punch-through from Barry Parr on Vimeo.
The Video came from the Coastsider, the page also has comments from the videographer, Barry Parr, which offer a good perspective on the event.
Click on through for more links etc.
Seattle tunnel will go under 158 buildings
The tunnel replacing the Alaskan Way Viaduct (SR-99) will pass beneath 158 existing structures requiring an extensive program of vibration and settlement monitoring as well as some remediation. Of the 158 buildings, WSDOT identified 20 […]