A 300 foot wide frozen debris flow has been moving towards an important Alaska highway and the Trans-Alaska pipeline at a rate of about 1-cm per day…and it seems to be accelerating. The ‘Frozen Debris Lobe’ as it is referred to by some researchers is now abot 150 feet from the highway, the pipeline is another 700 feet past that. This is a fascinating problem, and one that poses a real threat to the transportation and oil infrastructure of Alaska. But it seems like it will be playing out in slow motion over the coming years. [Source: ADN.com. Image: Guido Grosse / ADN.com]
Related Articles
Landslide Caused Pipeline Explosion on Leach Xpress Line
Polyurethane Used in Marcellus Shale Region Pipeline
Pipeline Contractor Uses Advanced Technology Product in Challenging Marcellus Shale Region: Saves Money, Reduces Labor Costs and Erosion, and Protects Pipeline
MOUNT AIRY, NC—As the largest consumers of world energy, the U.S. is counting on natural gas to play a greater role in our energy mix. The U.S. Energy Information Administration (EIA) predicts U.S. demand to increase 14 percent from 2008 to 2035 with heavy growth in the industrial and utility sectors, which means infrastructure for extracting, transporting, and storing gas is increasingly vital.
Companies like Canada’s Talisman Energy and it’s U.S. partners, are racing to build that infrastructure by putting down and protecting essential pipeline in rough, rural areas like the Marcellus Shale region of northeastern PA where severe climates can be challenging and requires new technologies like TerraThane polyurethane foam systems.
[Editor] Click through for the rest of this press release from NCFI [/Editor]