Modified from the YouTube description: Video of a DeWind One-Pass Trencher installing a Soil-Bentonite Wall 55′ deep. This is a mix in place technology capable of installations up to 125′ feet deep. The soils are evenly homogenized with the additives from top to bottom and from start to finish. An Average of 300 LF installed per day. No messy mixing ponds, open excavations, very little spoils, One piece of equipment and only 4 men are required for this 5000 LF installation reducing safety exposure.