• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
  • [ February 4, 2026 ] Young Engineering Geologists Gain Valuable Career Momentum Through New Zealand Alliance Projects Geologic Hazards
  • [ January 27, 2026 ] Registration Open for DFI’s 51st Annual Conference Conferences
  • [ January 27, 2026 ] Yangtze River TBM Rescue Project Related
HomeAllegheny River

Allegheny River

North Shore Connector Tunnel
Project Related

Alleghenny Tunnel Nearing Completion but Hurting for Money

February 26, 2009 rockman Comments Off on Alleghenny Tunnel Nearing Completion but Hurting for Money

Pittsburgh’s light rail expansion project dubbed the North Shore Connector Project has passed underneath the Allegheny River despite some earlier troubles. The cut and cover tunnel portion is complete, and the TBM bored portion of […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Ad van Zwieten lived on the Vijzelgracht until his house was declared unfit for habitation, after subsidences caused by the metro construction work. Photo Maurice Boyer, nrc.nl
  • Ground Engineering Magazine App
  • Groundhog - A geotechnical Python Package
  • Drill rig at the Newberry Geothermal Project site
  • Figure 1 This cut slope in massive, unfractuired conglomerate was smooth blasted. Treatment consisted of only drill trace removal on the main slope, but ledges were cut in natural boulder lenses at the cut end where similar features are in the adjoining natural terrain.
  • Sinkhole repair in Colorado on US 24 by Hayward Baker
  • Clyde N. Baker, Jr. (1930-2022)
  • Geosynthetic reinforced soil (GRS) bridge system, Defiance County, Ohio
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post