NYDOT Geotechnical Design Manual
The New York DOT has been working on a geotechnical design manual (GDM) since at least 2012. It is a very detailed document that covers pretty much every possible geotechnical aspect of a transportation project. […]
The New York DOT has been working on a geotechnical design manual (GDM) since at least 2012. It is a very detailed document that covers pretty much every possible geotechnical aspect of a transportation project. […]
Keynetix is preparing to restart their popular free webinar series. The theme for 2016 is “Transforming Your Geotechnical Data Journey in Small Steps.” The webinars will be every Friday at 12 pm EST for North […]
The folks at LogItEasy.com have put together a very useful, free online tool for converting Munsell color codes that you might use in the field into the actual color names. This functionality is also built […]
This is my colleague Dimitrios Zekkos, Associate Professor at the University of Michigan, and the founder of Geoengineer.org. He’s talking about his group’s research involving utilizing drones after natural disasters. Cool stuff! [Source: University of […]
I saw this video a few weeks back on The Landslide Blog, and it’s also been posted on GeoEngineer.org. It’s well worth the watch. It’s one of the scariest debris flow videos I’ve seen. Some […]
MOUNT AIRY, NC—A $2 million tunnel construction project on the Great Alleghany Passage (GAP) is reopened to the public with help from a geotechnical polyurethane foam called TerraThane, by US company, NCFI Polyurethanes.
The GAP rail-trail is 150 miles of hiking and biking between Cumberland, Md, and Pittsburgh, Pa. created along the former railway line. In Cumberland, the GAP joins the C&O Canal Towpath, creating a continuous 335-mile long trail experience all the way to Washington, DC. It’s become a favorite biking destination for people from around the Mid-Atlantic states. One of its main tunnels, the Pinkerton Tunnel, an 849-foot former Western Maryland Railway tunnel, has been closed since 1975 due to erosion and unstable conditions. The Allegheny Trail Alliance, the organization that built and now maintains the 150-mile GAP, and the Somerset County Rails-to-Trails Association (SCRTA), wanted the tunnel reopened and helped fund the project.
[Editor] Click through for the rest of the press release from GeoPrac sponsor, NCFI Polyurethanes (makers of TerraThane). [/Editor]
The New York MTA’s East Side Access Tunnel Project is what I would refer to as a ‘Mega Project’. Any time you’re in the Billions of dollars range, I’d say that qualifies, and this one […]
This video in Terracon’s video sequence on site characterization discusses lab testing. [Source: Terracon YouTube Channel. Image: YouTube]
The Bertha TBM creating the Alaska Way Viaduct Replacement Tunnel and the Seattle Tunnel Partners JV just can’t seem to catch a break. After being stopped for nearly 2 years to replace the entire cutterhead […]
The Geoprofessional Business Association has released a new guide document on the In-House Review of Geoprofessional Reports. The document has information for report writers and reviewers with a ‘focus on a report’s ability to satisfy […]
Copyright © 2007-2020 by Randy Post