The giant straddle cranes that load and unload cargo from the container ships at the Port of Oakland apply a fairly concentrated load along their wheel path. Over time, the wheel path area has settled, […]
The giant straddle cranes that load and unload cargo from the container ships at the Port of Oakland apply a fairly concentrated load along their wheel path. Over time, the wheel path area has settled, […]
URETEK ICR was contacted regarding settlement in two identical 1.5 million bushel grain flat storage buildings. The overall structure dimensions were 600 ft. long by 135 ft. wide with a Quonset style roof . Below the floor of the storage buildings, a tunnel with conveyance system and a series of aeration tunnels were installed to facilitate moisture control and grain transport.
[Editor] Check out the rest of this contributed Article from Ty Taylor of URETEK ICR, a GeoPrac.net sponsor. Ty describes how the foundations were lifted and stabilized using the URETEK Method® [/Editor]