No Picture
Articles

Stabilizing Wind Energy

Generic wind turbine photo

Recently, URETEK ICR was asked to review a project involving lifting and stabilization of 10 precast transformer pads at a wind farm located in South Dakota.

The pads had settled to varying degrees with 8 of the 10 having settled 1 (±0.5) inch and requiring only stabilization and the two remaining, with settlement in excess of 3.5 inches, requiring lift and stabilization.

[Editor] Click through for more on this interesting project by GeoPrac.net sponsor, URETEK ICR! [/Editor]

[…]