• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
  • [ August 16, 2026 ] Upcoming Webinar Looks at Engineering Concerns About Polyurethane Injection Available Resources
  • [ August 16, 2026 ] RSSeismic Adds Python Scripting and New Site-Response Capabilities Software Updates
HomeNewsProject RelatedSeattle Light-Rail Tunnel Likely to Break Ground This Year

Seattle Light-Rail Tunnel Likely to Break Ground This Year

February 11, 2008 rockman Project Related Comments Off on Seattle Light-Rail Tunnel Likely to Break Ground This Year

 

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • light-rail
  • seattle
  • tunnel
Previous

Utah Poised to Adopt Geologic Hazard Ordinances

Next

Colorado’s I-70 Could Have Boston’s Big Dig Beat

Related Articles

Brightwater Tunnel Boring Machine BT-2, nicknamed Helene. It was stuck some 300-ft underground for sever months while waiting for repair parts.
Project Related

King County, WA sues contractor on $1.8B Brightwater Sewer Project for cost and schedule overruns

June 29, 2010 rockman Project Related Comments Off on King County, WA sues contractor on $1.8B Brightwater Sewer Project for cost and schedule overruns

Current projections put the project completion 35-months behind schedule because of problems with a portion of the TBM constructed tunnel. The County is suing for $74M in damages associated with the delays. This massive sewer […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Project Related

The Claremont Tunnel – Designed to Survive Fault Rupture on the Hayward Fault

June 24, 2008 rockman Project Related Comments Off on The Claremont Tunnel – Designed to Survive Fault Rupture on the Hayward Fault

The Claremont tunnel beneath the Berkeley Hills on the east side of Oakland is a water supply tunnel that serves over 800,000 customers in Richmond, Oakland, San Leandro and neighboring communities. One of the unique things about the tunnel is that it crosses the active Hayward Fault. Most of the time when you talk about designing for earthquakes you’re talking about designing to withstand the seismic forces. In this case, the designers needed the water transmission tunnel to withstand up to 7.5-ft of offset due to fault slip and still maintain a minimum level of service. (Photo credit: Sue Bednarz, Jacobs Associates, Inc. by way of Civil Engineering Magazine)

This post describes the relatively recent Claremont Tunnel Seismic Upgrade Project as reported in Civil Engineering Magazine (May 2008, v. 78, no. 5, pp 58-63, 96-97).

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Bertha repair plan calls for excavating a shaft in front of the TBM.
Project Related

Bertha TBM Won’t Resume Drilling Until March 2015

April 22, 2014 rockman Project Related Comments Off on Bertha TBM Won’t Resume Drilling Until March 2015

Seattle Tunnel Partners released a new schedule this week for the repair of the damaged seals on the Bertha Tunnel Boring Machine. This revised schedule shows that the TBM won’t be digging again until March […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Falling weight deflectometer from Dynatest
  • GeoPrac Newsletter 053
  • Seattle Tunnel Partner workers roosting in the spokes of the Bertha TBM after the breakthrough
  • Water overflow descends the spillway from Anderson Reservoir, 1998. (Len Vaughn-Lahman, Mercury News)
  • April 1, 2014 Chilean Earthquake Location
  • Basalt-fiber reinforced polymer or BFRP rebar used on a bridge in Northern Ireland
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post