• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ March 30, 2026 ] Polyurethane 101 Webinar Tomorrow, March 31 Available Resources
  • [ March 27, 2026 ] Keller CEO Describes Their Business Available Resources
  • [ March 23, 2026 ] Landslide Emoji Coming to iOS 26.4 Available Resources
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
Homedraw down

draw down

The photo above shows a crack measuring roughly 500 ft in length that is part of the evidence in Tampa Bay Water's lawsuit against HDR.
Failures

Updated: Tampa Reservoir Failure Lawsuit Heats Up

April 12, 2012 rockman Comments Off on Updated: Tampa Reservoir Failure Lawsuit Heats Up

[Update 4/13/12] A verdict in favor of HDR was reached earlier this week.  They have been exhonerated of the charges and will pay no damages to Tampa Bay Water District. Read more on this GeoPrac.net […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Site effects in Mexico city: recordings from the 1985 earthquake
  • Hayward Baker is performing stone column work at two main sites for the Kansas Department of Transportation’s K-10 South Lawrence Trafficway project in Lawrence, Kan., with over 6,800 thirty-six-inch diameter stone columns to depths up to 62 feet.
  • Figure 1 This cut slope in massive, unfractuired conglomerate was smooth blasted. Treatment consisted of only drill trace removal on the main slope, but ledges were cut in natural boulder lenses at the cut end where similar features are in the adjoining natural terrain.
  • Drill rig at Atlantic Yards project showers pedestrians with debris
  • Conceptual drawing of Bertha rescue shaft
  • A Geosoft VOXI 3D earth model with high susceptibility indicated as a solid volume, overlain with topography and residual magnetics; useful as an aid in mineral exploration, when prospecting or targeting drillholes
  • Cannon Place office building in London
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post