• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
  • [ February 4, 2026 ] Young Engineering Geologists Gain Valuable Career Momentum Through New Zealand Alliance Projects Geologic Hazards
  • [ January 27, 2026 ] Registration Open for DFI’s 51st Annual Conference Conferences
  • [ January 27, 2026 ] Yangtze River TBM Rescue Project Related
HomeMaquoketa River

Maquoketa River

Aerial view of the Lake Delhi Recreation Association Dam after it had been compromised. (Mark Benischek)
Failures

Iowa asks FEMA to reconsider Lake Delhi decision, repair estimate $6M

November 10, 2010 rockman Comments Off on Iowa asks FEMA to reconsider Lake Delhi decision, repair estimate $6M

Part of the dam collapsed in July during flooding by the Maquoketa River, draining a nine-mile lake. FEMA officials decided the dam wasn’t elligible for federal emergency funding because it is owned by a private […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Nicholson - Giving You the Shaft, All Over the Country
  • Deadly landslide buries Xinmo village in Sichuan Province, China
  • Underground parking garage in 'Uptown' area of Dallas that needed TerraThane polyurethane foam
  • Free Online USCS Soil Classification Calculator
  • cal_landslide_susceptibility
  • Art Corwin, CEO of Moretrench
  • Figure 1 This cut slope in massive, unfractuired conglomerate was smooth blasted. Treatment consisted of only drill trace removal on the main slope, but ledges were cut in natural boulder lenses at the cut end where similar features are in the adjoining natural terrain.
  • Mercator map projection
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post