• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ March 30, 2026 ] Polyurethane 101 Webinar Tomorrow, March 31 Available Resources
  • [ March 27, 2026 ] Keller CEO Describes Their Business Available Resources
  • [ March 23, 2026 ] Landslide Emoji Coming to iOS 26.4 Available Resources
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
HomeNational Driller

National Driller

APE 400 vibratory driver/extractor in New Orleans
Project Related

APE’s 400 Vibratory Driver Extractor, ‘King Kong’ Extracts 140-ft Piles

April 4, 2011 rockman Comments Off on APE’s 400 Vibratory Driver Extractor, ‘King Kong’ Extracts 140-ft Piles

In Bell Chase, Louisiana, a huge vibratory driver/extractor manufactured by American Piledriving Equipment Inc. was used to extract 54-in diameter pipe piles 140-ft deep. The piles were part of a cofferdam for the largest pumping […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Portion of a failed 38-ft high modular block MSE retaining wall.
  • Hawk Rock Subsidence Feature 2004 - 2008 Interferogram
  • STP conceptual repair plan for Bertha.
  • GeoPrac.net President Randy Post around the time of the first GeoPrac post. That's his oldest daughter who is now in college!
  • Canterbury 2011 Earthquake Memorial
  • RECo MSE Wall at NASA's Wallops Flight Facility
  • Redi-Rock launches refreshed website
  • Excavation and ground freezing by Moretrench for MTA's Second Avenue Subway
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post