TBM Stuck on Pittsburgh North Short Connector Project
ENR reports that a Tunnel Boring Machine or TBM is stuck for the second time in two weeks on Pittsburgh’s light rail expansion project dubbed the North Shore Connector Project. As we described in a previous post, the project will consist primarily of a tunnel underneath the Allegheny River. The drilling began the week of March 3 and has been progressing at a rate of 30-ft/day or 5-ft/day faster than the original goals. Read on for a location map of the project, or download the Google Earth KMZ file showing the project area. (File photo of TBM)