• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ March 30, 2026 ] Polyurethane 101 Webinar Tomorrow, March 31 Available Resources
  • [ March 27, 2026 ] Keller CEO Describes Their Business Available Resources
  • [ March 23, 2026 ] Landslide Emoji Coming to iOS 26.4 Available Resources
  • [ February 9, 2026 ] Underground Leak Sealing Restores Coal Terminal Operations Project Related
  • [ February 4, 2026 ] Ground investigation for civil infrastructure gets more robust with integration of lab and field geotechnical data Press Releases
Hometimber pile

timber pile

image
Project Related

Emergency Repair of Allegheny River Lock No. 6

June 12, 2009 rockman Comments Off on Emergency Repair of Allegheny River Lock No. 6

Severe erosion was discovered on an October 2008 inspection of Allegheny River Lock and Dam No. 6 near Pittsburgh, PA, a US Army Corps of Engineers structure. In the Q1 2009 issue of PileDriver Magazine […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • NCFI TerraThane geotechical polymer used to square off raveling rock prior to forming a concrete wall
  • Using TerraThane products for lifting concrete pavement of I-85 in Atlanta, a Hayward Baker project.
  • Ground penetrating radar (GPR) antenna mounted on a small tractor surveying near the Stonehenge monument as part of a larger project that identified a row of 90 previously undiscovered stones less than 3 km from Stonehenge.
  • moretrenchlogo
  • Dennis Miller, former park manager on a dock on the west side of Duke Lake in Ryerson Station State Park. The dam seen in the background, was damaged resulting in the lake being drained in July 2005.
  • NCHRP Report 676: Intelligent Soil Compaction Systems
  • Radioactive waste barrel for possible future underground storage
  • Slide from ODOT Geotechnical Data Management System presentation by Kirk Beach
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post