A bicyclist went around the barricades at the California Highway 1 Devil’s Slide Tunnel project after work hours and rode his bike through one of the tunnels, recording video as he went. I don’t advocate […]
The New York MTA is in the midst of a “golden era” of tunneling for the New York subway. Three separate mega-projects are currently underway totaling some $15 Billion: The Second Avenue Subway, The East Side Access Project (which features the new Grand Central Terminal), and The Number 7 Subway Line Extension Project. The short video below was published by the NY Post and included in an AP Article. It is tantalizingly short, but gives a great perspective on what the underground construction project at Grand Central looks like and a sense of the scale…the amazing huge caverns being constructed. The article says that from underneath Grand Central Terminal alone, the construction crews have removed enough material to cover Central Park almost a foot deep!
[Source: KOMO News (Seattle) via ASCE SmartBrief. Image: AP Photo/Mary Altaffer via KOMOnews.com]
Click through for the video.
This video from RockWare shows a 4D Google Earth tour of a simulated groundwater contamination plume migration created using several tools in their RockWorks software package.
Copyright © 2007-2020 by Randy Post
