UK structural and geotechnical engineers have long used the British Standard codes for design of railroad bridges. Those days are now gone as all rail structures are required to use the Eurocode. This article is a nice overview of the code system, which is separated into 10 codes with a total of 58 parts, and 58 country specific National Annexes. [Source: rail.co. Image: Rail.co]
Related Articles
Backfilling the 1931 Tucker Tunnel in St. Louis with Geotechnical Fill, Geofoam Blocks
October 28, 2010
rockman
Project Related
Comments Off on Backfilling the 1931 Tucker Tunnel in St. Louis with Geotechnical Fill, Geofoam Blocks