The world’s largest Tunnel Boring Machine or TBM just arrived in Seattle last week from Japan. Hitachi Zosen Corp built the 57 foot diameter TBM and tested it before disassembling it for the journey by boat to the Port of Seattle. Bertha will soon begin it’s 16 month journey to bore a tunnel to replace the famous Alaskan Way Viaduct along Seattle’s waterfront. [Source: Puget Sound Business Journal via ASCE SmartBrief. Image: www.bizjournals.com/]
Related Articles
Bertha TBM Won’t Resume Drilling Until March 2015
Historic Pennsylvania Tunnel Reopens with Help From NCFI’s TerraThane Polyurethane Foam
MOUNT AIRY, NC—A $2 million tunnel construction project on the Great Alleghany Passage (GAP) is reopened to the public with help from a geotechnical polyurethane foam called TerraThane, by US company, NCFI Polyurethanes.
The GAP rail-trail is 150 miles of hiking and biking between Cumberland, Md, and Pittsburgh, Pa. created along the former railway line. In Cumberland, the GAP joins the C&O Canal Towpath, creating a continuous 335-mile long trail experience all the way to Washington, DC. It’s become a favorite biking destination for people from around the Mid-Atlantic states. One of its main tunnels, the Pinkerton Tunnel, an 849-foot former Western Maryland Railway tunnel, has been closed since 1975 due to erosion and unstable conditions. The Allegheny Trail Alliance, the organization that built and now maintains the 150-mile GAP, and the Somerset County Rails-to-Trails Association (SCRTA), wanted the tunnel reopened and helped fund the project.
[Editor] Click through for the rest of the press release from GeoPrac sponsor, NCFI Polyurethanes (makers of TerraThane). [/Editor]