• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
  • [ August 16, 2026 ] Upcoming Webinar Looks at Engineering Concerns About Polyurethane Injection Available Resources
  • [ August 16, 2026 ] RSSeismic Adds Python Scripting and New Site-Response Capabilities Software Updates
Hometampa

tampa

No Picture
Failures

Jury Returns Verdict for HDR in Lawsuit by Tampa Bay Water

April 13, 2012 rockman Comments Off on Jury Returns Verdict for HDR in Lawsuit by Tampa Bay Water

A federal jury deliberated only 3 hours to return a verdict in favor of HDR, exonerating them of claims by Tampa Bay Water that they had violated the standard of care in the design of […]

The photo above shows a crack measuring roughly 500 ft in length that is part of the evidence in Tampa Bay Water's lawsuit against HDR.
Failures

Updated: Tampa Reservoir Failure Lawsuit Heats Up

April 12, 2012 rockman Comments Off on Updated: Tampa Reservoir Failure Lawsuit Heats Up

[Update 4/13/12] A verdict in favor of HDR was reached earlier this week.  They have been exhonerated of the charges and will pay no damages to Tampa Bay Water District. Read more on this GeoPrac.net […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • California coastal bluff landslide
  • Cliffwalk at Capilano Suspension Bridge Park
  • GeoPrac Newsletter 053
  • Keller is providing technically complex supporting works for Yonge Station as part of the Eglinton Crosstown line project in Toronto.
  • Cal's Memorial Stadium, schedule for seismic upgrades
  • Bridge piers left incomplete after slope movement caused them to be out of plumb on the Oregon Route 20 Project from Pioneer to Eddyville
  • Moretrench V.P. Paul C. Schmall, Recipient of the 2015 Wallace Hayward Baker Award
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post