Attempting to Remove the Pipe Blocking Bertha
The Seattle Tunnel Partners JV is attempting to remove the rest of an 8 inch diameter steel well casing that has been blocking the Bertha tunnel boring machine since December 8, 2013. The upper 55 […]
The Seattle Tunnel Partners JV is attempting to remove the rest of an 8 inch diameter steel well casing that has been blocking the Bertha tunnel boring machine since December 8, 2013. The upper 55 […]
WSDOT held a press conference on Friday to discuss findings regarding the obstruction that had stalled the Bertha Tunnel Boring Machine since December 6. It is an 8 inch well casing, 119 feet deep from […]
Copyright © 2007-2020 by Randy Post