• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • Events
    • Events Main
    • Add an Event
    • Webinars
    • Conferences
    • Calls For Abstracts
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ September 12, 2025 ] Ground Improvement Strategies: Insights from Recent Webinars Available Resources
  • [ September 11, 2025 ] DFI Announces 2025 Distinguished Service Award Recipient Press Releases
  • [ September 4, 2025 ] AASHTO Releases 45th Edition of Materials Standards: What Geotechnical Engineers Need to Know Standards and Codes
  • [ September 3, 2025 ] RSWall Webinar Recap: Advanced Gabion Wall Solutions with Rocscience and Maccaferri Available Resources
  • [ September 2, 2025 ] Nicholson Legends and Iconic Projects: A 70-Year Celebration of Geotechnical Excellence Available Resources
HomeNewsRegionalFinland’s Nuclear Waste Storage Plans

Finland’s Nuclear Waste Storage Plans

April 1, 2008 rockman Regional Comments Off on Finland’s Nuclear Waste Storage Plans

Source: BBC by way of Ontario-Geofish

 

Share this:

  • Tweet
  • Click to email a link to a friend (Opens in new window) Email
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Pocket
  • Share on Tumblr
  • Finland
  • nuclear waste
  • Onkalo
  • Yucca Mountain
Previous

Landslide on Arizona SR 87 Closes Highway

Next

GeoPrac Turns One!

Related Articles

Nuclear waste disposal tunnel at Onkalo Facility in Finland, 2022
Project Related

Finnish Deep Nuclear Waste Disposal Reaches Milestone

August 19, 2022 rockman Project Related Comments Off on Finnish Deep Nuclear Waste Disposal Reaches Milestone

Finland is leading the world when it comes to permanently disposing of spent nuclear fuel in a deep geologic repository. Their Onkalo facility recently completed excavation of the first of five final disposal tunnels, a […]

Share this:

  • Tweet
  • Click to email a link to a friend (Opens in new window) Email
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Pocket
  • Share on Tumblr
image
Rockman's Ramblings

Indefinite “Temporary” Nuclear Waste Storage and the Need for Nuclear Power

July 24, 2009 rockman Rockman's Ramblings Comments Off on Indefinite “Temporary” Nuclear Waste Storage and the Need for Nuclear Power

image Since the Yucca Mountain nuclear waste repository has gotten the axe from President Obama, nuclear power plants around the country are faced with the prospect of virtually indefinite "temporary" storage of their nuclear waste in the form of spent fuel rods. The US Department of Energy has a legal obligation to find a permanent disposal facility for the spent fuel, and the agreements currently in place presumed that Yucca Mountain would be accepting nuclear waste by 2025 which clearly won’t happen. (Photo of dry cask temporary storage method for spent nuclear fuel from Connecticut Yankee). More after the break. […]

Share this:

  • Tweet
  • Click to email a link to a friend (Opens in new window) Email
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Pocket
  • Share on Tumblr
Geologic Hazards

USDOE Problems With [Not] Storing Nuclear Waste

February 18, 2008 rockman Geologic Hazards Comments Off on USDOE Problems With [Not] Storing Nuclear Waste

More problems for the US Department of Energy related to the Yucca Mountain Nuclear Waste Repository. The New York Times is reporting that the DOE is already 10 years behind in a commitment made to Power Companies to store their nuclear waste, and according to the DOE, it will likely be at least another 10 years before they are able to begin accepting waste for permanent storage. Who cares you ask? Well, the US has already payed out $342 million in 60 lawsuits filed by utility companies, and that total could reach $11 billion according to government estimates or $35 billion according to industry estimates before Yucca Mountain finaly opens and begins accepting waste. Source: New York Times by way of Ontario-geofish.

[…]

Share this:

  • Tweet
  • Click to email a link to a friend (Opens in new window) Email
  • Click to share on Reddit (Opens in new window) Reddit
  • Click to share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Pocket
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Notice
There are no upcoming events.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Hayward Baker and Moretrench joint venture project at Columbia University’s Manhattanville campus.
  • WSP and Golder
  • April 10, 2013 landslide at the Bingham Canyon Mine in Utah
  • American Society of Testing Materials Logo - ASTM
  • ADSC Technical Library Catalog
  • Arturo L. Ressi di Cervia, recipient of the 2013 DFI Distinguished Service Award
  • St. Louis Arch
  • California Board for Geologists and Geophysicists to Be Eliminated Under Current Budget
  • Incorporating geotechnical data in BIM allows considered design optioneering and refinement at the outset of a project; minimises geotechnical risk in construction and enables cost-effective repairs and maintenance of assets throughout the project’s lifetime. Image courtesy of Mott MacDonald.
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post