For those outside the UK, the Crossrail project is a mega-project upgrade to the London metro area’s subway system. The tunneling portion of the project will consist of 21-km of twin-bore tunnels excavated by eight closed-faced tunnel boring machines, six of which will be earth pressure balance machines (EPBMs). The UK’s Geological Society has published an interesting article on the geology of the crossrail project. Some of the geological and geotechnical challenges of the project include the famous London Clay, sensitive structures, faults, and rapid transitions between permeable and relatively impermeable formations creating potential water pressure issues. [Source: Geological Society. Image: Geological Society]
Related Articles
USBR Engineering Geology Group
Homepage for one of the best free resources for engineering geologists, the USBR Engineering Geology Field Manual. They also have information on Terrestrial 3d Photogrammetry and LIDAR for rock mass characterization and other applications. Visit […]
London Crossrail Project – Europe’s Largest Construction Project
Seven new design contracts were issued today for the Crossrail project including four central London Stations and three significant portals. According to the New Civil Engineer, the project is being called "Europe’s Largest Construction Project". […]
The Claremont Tunnel – Designed to Survive Fault Rupture on the Hayward Fault
The Claremont tunnel beneath the Berkeley Hills on the east side of Oakland is a water supply tunnel that serves over 800,000 customers in Richmond, Oakland, San Leandro and neighboring communities. One of the unique things about the tunnel is that it crosses the active Hayward Fault. Most of the time when you talk about designing for earthquakes you’re talking about designing to withstand the seismic forces. In this case, the designers needed the water transmission tunnel to withstand up to 7.5-ft of offset due to fault slip and still maintain a minimum level of service. (Photo credit: Sue Bednarz, Jacobs Associates, Inc. by way of Civil Engineering Magazine)
This post describes the relatively recent Claremont Tunnel Seismic Upgrade Project as reported in Civil Engineering Magazine (May 2008, v. 78, no. 5, pp 58-63, 96-97).