Normally when driven piles are used as deep foundation elements, there is a large amount of pile waste when the portion of the piles left sticking up out of the ground are cut off to the desired elevation. UK piling contractor, Balfour Beatty and Finnish company Junttan have created a system that attaches to piling rigs and cuts off precast concrete piles as low as about 4 inches from the ground surface. The cut pieces are then used as starter pieces for the next pile. Balfour Beatty calculates that each precast concrete pile delivered to the site represents approximately 90 to 130 pounds of CO2 released into the atmosphere. They estimate that implementing this system on two piling rigs to date will translate into 2,000 metric tons of reduced CO2 emissions per year. [Source: Construction Enquirer via ASCE SmartBrief. Image: Construction Enquirer]
Related Articles
Big Design Build Projects with Dan Brown and Associates
April 29, 2016
rockman
Available Resources
Comments Off on Big Design Build Projects with Dan Brown and Associates
Paper on Underwater Noise Reduction of Marine Pile Driving
January 6, 2017
rockman
Available Resources
Comments Off on Paper on Underwater Noise Reduction of Marine Pile Driving
DFI Deep Foundations Magazine – March/April 2018 Issue
April 12, 2018
rockman
Available Resources, News
Comments Off on DFI Deep Foundations Magazine – March/April 2018 Issue
The Deep Foundations Institute (DFI) has published it’s Mar/Apr 2018 issue of Deep Foundations Magazine. Feature articles include: High-Capacity Micropiles for Bulfinch Crossing Drilled Shaft Construction – Selecting the Appropriate Equipment and Tooling CSM Support […]