I know this video made the rounds by email and on Geoengineer a while back, but I haven’t posted it here. It shows a novel way of installing piles in softer soil. Those guys have some nice rhythm! Happy Friday.
Related Articles
Video: Simulation View of Washington SR 99 Bored Tunnel (Alaskan Way Viaduct Replacement)
March 24, 2010
rockman
Project Related
Comments Off on Video: Simulation View of Washington SR 99 Bored Tunnel (Alaskan Way Viaduct Replacement)
3-Dimensional Crack Monitoring Gauges
November 3, 2017
rockman
Available Resources, News
Comments Off on 3-Dimensional Crack Monitoring Gauges
Video: Moving 7 Million Cubic Yards – Calaveras Dam Replacement Project Timelapse
May 20, 2016
rockman
Available Resources
Comments Off on Video: Moving 7 Million Cubic Yards – Calaveras Dam Replacement Project Timelapse
2 Comments
Comments are closed.
So….would we call that a 6 MP (man power) vibratory hammer? If we consider it an impact hammer, what is the rated energy? 😉
I like it. And if you run into a stiffer material, you just put on some speed metal music! 😀