• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ October 11, 2026 ] Hexagon to Acquire Rocscience in a Big Geotechnical Software Deal Comings and Goings
  • [ October 11, 2026 ] Weekend CUP: Catching Up on Geotechnical News for October 2026 Weekend CUP
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
HomeSecond Ave

Second Ave

No Picture
Project Related

Buildings above New York MTA’s Second Ave Subway alignment need $6-8M in Repairs

June 27, 2010 rockman Comments Off on Buildings above New York MTA’s Second Ave Subway alignment need $6-8M in Repairs

  All told, at least 60 buildings along Second Avenue need repair or construction work to keep them from becoming a danger to the public. The MTA is evaluating more than 100 other sites between […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Brightwater Tunnel Boring Machine BT-2, nicknamed Helene. It was stuck some 300-ft underground for sever months while waiting for repair parts.
  • Bridge in a backback technology, workers inflate carbonfiber tubes and fill them with concrete
  • Engineer's Week 2025
  • MSE Retaining Wall berm for a landfill
  • Sand boil near Lake Bruin State Park in St. Joseph, La.
  • Water from rooftop pool spilling from Manila high-rise during April 2019 earthquake
  • Bridge
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post