
Project Related
Flooding Halts Tunnel Excavations for Lake Mead Water Supply Intake
Excavation for the $700M Lake Mead Intake No. 3 Project was put on hold after tunneling encountered a fault carrying groundwater that flooded the excavation and submerged equipment. The flooding occurred over about 4-days, so […]