
Our colleagues over at Geoengineer.org put together a great video compiling some of the more interesting stories of 2016 for all of us geotechnical nerds. Check it out! [Source: Geoengineer.org YouTube Channel. Image: YouTube]

Our colleagues over at Geoengineer.org put together a great video compiling some of the more interesting stories of 2016 for all of us geotechnical nerds. Check it out! [Source: Geoengineer.org YouTube Channel. Image: YouTube]
The New York MTA is in the midst of a “golden era” of tunneling for the New York subway. Three separate mega-projects are currently underway totaling some $15 Billion: The Second Avenue Subway, The East Side Access Project (which features the new Grand Central Terminal), and The Number 7 Subway Line Extension Project. The short video below was published by the NY Post and included in an AP Article. It is tantalizingly short, but gives a great perspective on what the underground construction project at Grand Central looks like and a sense of the scale…the amazing huge caverns being constructed. The article says that from underneath Grand Central Terminal alone, the construction crews have removed enough material to cover Central Park almost a foot deep!
[Source: KOMO News (Seattle) via ASCE SmartBrief. Image: AP Photo/Mary Altaffer via KOMOnews.com]
Click through for the video.
The Redi-Rock Design Resource Manual or DRM has everything you would need to design a Redi-Rock retaining wall, including block sizes, design charts, construction details, and setback options. The manual also includes case studies and […]
Keller, a long-time sponsor of GeoPrac.net, has released its 2025 Year in Review video, highlighting project achievements, technical milestones, and company activities from the past year. The video provides a look back at how Keller […]
Copyright © 2007-2020 by Randy Post
