• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
  • [ August 16, 2026 ] Upcoming Webinar Looks at Engineering Concerns About Polyurethane Injection Available Resources
  • [ August 16, 2026 ] RSSeismic Adds Python Scripting and New Site-Response Capabilities Software Updates
HomeNewsProject RelatedSea-Tac Runway Nearing Completion

Sea-Tac Runway Nearing Completion

June 30, 2008 rockman Project Related Comments Off on Sea-Tac Runway Nearing Completion

 

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • MSE wall
  • Sea-Tac
  • third runway
Previous

380,000 Jobs Now in Jeopardy Because Congress Fails To Rescue America’s Transportation Account

Next

Top 50 GeoPrac Content Items of 2008 Q2

Related Articles

Articles

Geotechnical Construction for a Rail Spur at a Rock Quarry

September 4, 2008 W. Robert Thompson, III, P.E. Articles, Retaining Walls 1

Our first article from Robert Thompson with Dan Brown and Associates. A project profile of a challenging project invoving a railroad spur for a quarry. It involved ground improvement, soil nailing, and MSE walls.

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Completed side-hill retaining wall for the SR 264 Second Mesa project in Arizona. Photo by Bharat Khandel, ADOT by way of NCS Consultants, LLC
Articles

Side Hill Retaining Walls – Part 1

March 12, 2009 rockman Articles, Retaining Walls Comments Off on Side Hill Retaining Walls – Part 1

Completed side-hill retaining wall for the SR 264 Second Mesa project in Arizona. Photo by Bharat Khandel, ADOT by way of NCS Consultants, LLCSide-hill retaining walls refer primarily to fill-walls built partway down the sides of an existing slope or embankment. They are encountered in roadway and rail widening projects as well as site development but usually in steep terrain. This article provides an overview of the problems, failure mechanisms, investigation approaches, analysis tools and wall type alternatives for these structures. Click through to read the article!

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Cellular concrete backfill behind an MSE retaining wall
Available Resources

TRB Webinar: Updates to MSE Retaining Wall Design Procedures

September 3, 2020 rockman Available Resources Comments Off on TRB Webinar: Updates to MSE Retaining Wall Design Procedures

AASHTO bridge design specifications were updated this year, with the largest change to designs for Mechanically-Stabilized Earth (MSE) walls in more than 20 years. TRB will host a webinar on Thursday, October 8, 2020 from […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Grain bin at a Williamsburg, Virgina poultry processing facility that had foundation settlement issues
  • Water infrastructure tunnel - Copyright Black and Veatch
  • 2013TerzaghiLectureThumbnail
  • Big Stan, the largest foundation drill rig in the southwest
  • NCHRP Synthesis 428 - Practices and Procedures for Site-Specific Evaluations of Earthquake Ground Motions
  • Ground penetrating radar (GPR) antenna mounted on a small tractor surveying near the Stonehenge monument as part of a larger project that identified a row of 90 previously undiscovered stones less than 3 km from Stonehenge.
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post