A crane using a pile driver to install new foundations for the Barnette Street Bridge project. A DOT (City of Fairbanks?) spokesman speculated that the crane overextended itself while installing piles about 40-ft away. The same spokesman said the crane had been using the same pad for the past month without any problems. [Source: Fairbanks Daily News via ASCE SmartBrief. Image: Fairbanks DOT& Public Facilities via Fairbanks Daily News]
Related Articles
UK railroad engineers now designing with Eurocodes
August 8, 2011
rockman
Standards and Codes
Comments Off on UK railroad engineers now designing with Eurocodes
Big Design Build Projects with Dan Brown and Associates
April 29, 2016
rockman
Available Resources
Comments Off on Big Design Build Projects with Dan Brown and Associates