As part of an ongoing ADSC research project on axial capacity of drilled shaft rock sockets in the Southeastern US, several test shafts were constructed this past week and the load test portion will commence later in August. Dan Brown and Associates are hosting a contest to predict the results of the O-Cell testing. Feeling lucky? Go read more about the project and the contest. Photos and other info should be posted this week to help with the predictions that are due by COB August 12. [Source: Dan Brown and Associates, PC]
Related Articles
Miscellaneous
Big Stan – Biggest Truck Mounted Drill in the Southwest Busy near Las Vegas
July 31, 2011
rockman
Miscellaneous
Comments Off on Big Stan – Biggest Truck Mounted Drill in the Southwest Busy near Las Vegas
Big Stan is a drill rig like no other. Weighing in at 250,000 lb with a mast 90-ft high, it is the largest truck mounted drill rig in the southwest and possibly one of the […]
Project Related
Load Test For New I-35W Bridge
The fast-tracked replacement bridge for the collapsed I-35W bridge in Minneapolis is taking another step forward. A load test shaft was scheduled to be tested on Thanksgiving day. (Photo by Koldark)
Software Updates
Exciting New Deep Foundation Design Software
October 3, 2016
rockman
Software Updates
Comments Off on Exciting New Deep Foundation Design Software
Geotechnical software company, Deep Excavation, LLC has just announced a new software product for design of deep foundations. The product page for DeepFND notes that it brings together geotechnical design and structural design of deep […]
