• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
  • [ August 16, 2026 ] Upcoming Webinar Looks at Engineering Concerns About Polyurethane Injection Available Resources
  • [ August 16, 2026 ] RSSeismic Adds Python Scripting and New Site-Response Capabilities Software Updates
HomeNewsAvailable ResourcesVideo: iPad used for day-to-day operations of Chicago area ready-mix plant

Video: iPad used for day-to-day operations of Chicago area ready-mix plant

September 21, 2011 rockman Available Resources Comments Off on Video: iPad used for day-to-day operations of Chicago area ready-mix plant

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • Chicago
  • concrete
  • iPad
  • ready-mix
  • video
Previous

Seminars in VA on Helical Foundation Systems, Helical Soil Nails & Push Piers

2011-08-31_11-46-33_299Next

Challenging WV Transmission Station Pipeline Job on 58-Degree Slope Uses TerraThane by U.S. Company, NCFI Polyurethanes

Related Articles

No Picture
Failures

Video: Aerial Shots of Leaning Tower of South Padre

October 2, 2009 rockman Failures 1

In a previous post, I described the planned demolition of a high-rise condo development on South Padre Island in Texas because of 16-in or more of settlement. This video from YouTube (SouthPadreParade is the username) […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Nortex employees stabilizing Houston area freeway with TerraThane Polyurethane Foam
Press Releases

Nortex and TerraThane Stabilize Houston Area Highways

May 1, 2015 rockman Press Releases Comments Off on Nortex and TerraThane Stabilize Houston Area Highways

Houston’s Highways, Some of Busiest in Nation, Use Innovative TerraThane Polyurethane Foam Technology to Repair Bad Bridge Approaches, Uneven Joints, and Roadway Depressions.

Nortex employees stabilizing Houston area freeway with TerraThane Polyurethane Foam

MOUNT AIRY, NC—Highways around Houston, TX, known as one the nation’s worst cities for traffic behind Los Angeles, D.C., and Atlanta, need constant repair, but can’t be closed while the work is done. Nortex Concrete Lift and Stabilization, Inc., a Ft. Worth, TX company, recently completed a whirlwind repair project on one of the city’s busiest corridors in the NE quadrant where I-10, 610 Loop, I-59, and I-69 feed millions of cars daily to, from, and around Harris County.

Normal groundwater erosion beneath the highways causes the concrete highway slabs to drop, roadway depressions, uneven bridge approaches, and uneven joints that make driving bumpy and uncomfortable, dangerous, and causes severe wear and tear on automobiles.

To make the repairs, the Texas Department of Transportation, TXDOT, brought in Nortex. The company carefully planned out the repairs for the half million pound project, and sent out four crews each with it’s own box truck rig to use a relatively new technology called “foamjacking.” Foamjacking uses high-density polyurethane foam to fill the subterranean voids, and lift the concrete slabs to proper level. “We’ve been lifting and stabilizing roadways with polyurethane foam since we got into the business back in 2003,” says Casey Derosa, asst. gen. mgr. of Nortex. “It’s a far superior method versus the old way of mudjacking.” Mudjacking is a ubiquitous term for a mix of mud, sand, cement, crushed limestone, and water hydraulically pumped into large holes drilled into the concrete slabs to fill voids and level the slabs. Mudjacking uses more and much larger equipment, and requires larger holes to be drilled. It typically requires the roadway to be closed much longer than foamjacking, and takes more time to clean up.

[Editor] Click through for the rest of the press release from GeoPrac sponsor NCFI Polyurethanes. [/Editor]

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Available Resources

Good Intro Video on Drilled Shaft Construction

August 4, 2016 rockman Available Resources Comments Off on Good Intro Video on Drilled Shaft Construction

This is a really nice video for folks new to the industry who want to learn about drilled shafts. It has some great photos and hits the high points of what the advantages of drilled […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Tetra Tech
  • ASTM standards referenced in the 2009 International Building Code (IBC)
  • Hayward Baker’s iconic calendar comes to life with augmented reality app
  • A worker surveys the damage from a blast gone wrong for the Second Ave. Tunnel Project
  • Aerial view of the Lake Delhi Recreation Association Dam after it had been compromised. (Mark Benischek)
  • Road header breaking through at Devil's Slide Tunnel
  • Sinkhole in a Beijing Street on April 26, 2011 - possibly resulting from tunneling ground loss from Beijing subway construction
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post