• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ November 14, 2026 ] Deadly Brooklyn Building Collapse Raises Questions About Excavation Support Failures
  • [ November 5, 2026 ] Weekend CUP: Rockfalls, Remote Foundations, and Better Use of Geotechnical Data Weekend CUP
  • [ November 4, 2026 ] Panama Earthquake Leaves a Landscape of Landslides Geologic Hazards
  • [ November 4, 2026 ] GEOExplorerIQ Aims to Bring Geotechnical Monitoring Data Together Software Updates
  • [ November 1, 2026 ] Aberfan at 60: Remembering the People and Carrying the Lessons Forward Failures
HomeNewsProject RelatedVideo Tour of NY Subway Mega-Projects

Video Tour of NY Subway Mega-Projects

February 11, 2013 rockman Project Related Comments Off on Video Tour of NY Subway Mega-Projects
In this Tuesday, Jan. 29, 2013 photo, contractors work on the East Side Access project beneath midtown Manhattan, in New York.

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • and
  • article
  • below
  • included
  • post
  • published
  • says
  • the
  • video
  • was
Previous

DFI 2013 Awards: Call for Entries

AP1000 Becker Hammer DrillNext

Novotech Launches Becker Penetration Test Software (NovoBPT)

Related Articles

No Picture
Available Resources

UC Berkley GeoEngineering Lectures on YouTube

June 3, 2009 rockman Available Resources Comments Off on UC Berkley GeoEngineering Lectures on YouTube

UC Berkley has a bunch of lectures online, including three geoengineering themed ones. It appears that they were all from lectures given as a part of the 27th Annual GeoEngineering Distinguished Lecture Series on May 8, 2009. So if you have an hour plus to kill per lecture (and I haven’t yet), you can check out one of the following.

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
No Picture
Available Resources

3-Dimensional Crack Monitoring Gauges

November 3, 2017 rockman Available Resources, News Comments Off on 3-Dimensional Crack Monitoring Gauges

I came across this interesting product for structural/geotechnical monitoring of cracks in 3 dimensions.  Most crack monitors are designed for monitoring in 2 dimensions, this one can measure movement out of the plane of monitoring.  […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Pinkerton Tunnel
Press Releases

Historic Pennsylvania Tunnel Reopens with Help From NCFI’s TerraThane Polyurethane Foam

January 26, 2016 rockman Press Releases Comments Off on Historic Pennsylvania Tunnel Reopens with Help From NCFI’s TerraThane Polyurethane Foam

Pinkerton TunnelMOUNT AIRY, NC—A $2 million tunnel construction project on the Great Alleghany Passage (GAP) is reopened to the public with help from a geotechnical polyurethane foam called TerraThane, by US company, NCFI Polyurethanes.

The GAP rail-trail is 150 miles of hiking and biking between Cumberland, Md, and Pittsburgh, Pa. created along the former railway line. In Cumberland, the GAP joins the C&O Canal Towpath, creating a continuous 335-mile long trail experience all the way to Washington, DC. It’s become a favorite biking destination for people from around the Mid-Atlantic states. One of its main tunnels, the Pinkerton Tunnel, an 849-foot former Western Maryland Railway tunnel, has been closed since 1975 due to erosion and unstable conditions. The Allegheny Trail Alliance, the organization that built and now maintains the 150-mile GAP, and the Somerset County Rails-to-Trails Association (SCRTA), wanted the tunnel reopened and helped fund the project.

[Editor] Click through for the rest of the press release from GeoPrac sponsor, NCFI Polyurethanes (makers of TerraThane). [/Editor]

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Dan Cadenhead, newly appointed senior vice president for Western Region operations of Hayward Baker
  • Golder Foundation Infographic
  • Seismic Design of Geosynthetic-Reinforced Soil Bridge Abutments with Modular Block Facing
  • hutchinson_sinkhole
  • Precast bridge abutment panel
  • Settlement of Pier on Leo Frigo Bridge - Photo by H. Marc Larson/Gannett Wisconsin Media
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post