Video Tour of NY Subway Mega-Projects
UC Berkley has a bunch of lectures online, including three geoengineering themed ones. It appears that they were all from lectures given as a part of the 27th Annual GeoEngineering Distinguished Lecture Series on May 8, 2009. So if you have an hour plus to kill per lecture (and I haven’t yet), you can check out one of the following.
I came across this interesting product for structural/geotechnical monitoring of cracks in 3 dimensions. Most crack monitors are designed for monitoring in 2 dimensions, this one can measure movement out of the plane of monitoring. […]
MOUNT AIRY, NC—A $2 million tunnel construction project on the Great Alleghany Passage (GAP) is reopened to the public with help from a geotechnical polyurethane foam called TerraThane, by US company, NCFI Polyurethanes.
The GAP rail-trail is 150 miles of hiking and biking between Cumberland, Md, and Pittsburgh, Pa. created along the former railway line. In Cumberland, the GAP joins the C&O Canal Towpath, creating a continuous 335-mile long trail experience all the way to Washington, DC. It’s become a favorite biking destination for people from around the Mid-Atlantic states. One of its main tunnels, the Pinkerton Tunnel, an 849-foot former Western Maryland Railway tunnel, has been closed since 1975 due to erosion and unstable conditions. The Allegheny Trail Alliance, the organization that built and now maintains the 150-mile GAP, and the Somerset County Rails-to-Trails Association (SCRTA), wanted the tunnel reopened and helped fund the project.
[Editor] Click through for the rest of the press release from GeoPrac sponsor, NCFI Polyurethanes (makers of TerraThane). [/Editor]
Copyright © 2007-2020 by Randy Post
