• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ November 14, 2026 ] Deadly Brooklyn Building Collapse Raises Questions About Excavation Support Failures
  • [ November 5, 2026 ] Weekend CUP: Rockfalls, Remote Foundations, and Better Use of Geotechnical Data Weekend CUP
  • [ November 4, 2026 ] Panama Earthquake Leaves a Landscape of Landslides Geologic Hazards
  • [ November 4, 2026 ] GEOExplorerIQ Aims to Bring Geotechnical Monitoring Data Together Software Updates
  • [ November 1, 2026 ] Aberfan at 60: Remembering the People and Carrying the Lessons Forward Failures
HomeGotthard Base tunnel

Gotthard Base tunnel

A Herrenknecht TBM breaks through on the eastern tube of the Gotthard Base Tunnel on Oct. 15.
Project Related

Gotthard Base Tunnel Achieves Milestone

October 25, 2010 rockman Comments Off on Gotthard Base Tunnel Achieves Milestone

On October 15, a major milestone was reached on Europe and the World’s longest rail tunnel. The Gotthard Base tunnel under the Swiss Alps will form a high speed rail link between northern and southern […]

Surveyors working in the Gotthard Base Tunnel, longest tunnel in the world.
Project Related

Building the world’s longest tunnel tests advanced surveying technologies

June 17, 2010 rockman Comments Off on Building the world’s longest tunnel tests advanced surveying technologies

The Gotthard Base Tunnel will eventually be a 35-mile rail tunnel through the famed Alps in southern Switzerland. So what does it take to survey the world’s longest tunnel? How about setting some 7,000 points […]

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Geofoam EPS blocks at the campus of Versa-Tech for the Tucker Tunnel project in St. Louis
  • Project Orange Map
  • Malcolm Drilling's clamshell bucket taking a scoop out while excavating the access pit
  • Green building
  • James Hind (left), Keller Group's Divisional President, North America and Eric Drooff (right), President of Hayward Baker, now also Keller Group's COO, North America.
  • Indonesian mud volcano after just 2 years of continuous eruption. Some scientists say it could continue for the next 25 to even 80 years.
  • london_corinthia_hotel_craned_rig
  • A car is crushed by a rockfall near Rotura, New Zealand
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post