London’t mega-project known as Crossrail that involves the construction of 118 km (73 mi) of new rail line with 42 km (26 mi) of new tunnels. The geotechnical investigation for Crossrail included rock coring, and some 561 pallets of core are going to be stored inside the mined out portion of a salt mine in Cheshire. The temperature and humidity levels remain consistent year-round making it an ideal place to store the core. According to the NCE article, this material is less than half of the core drilled during the investigation phase of the project. [Source: New Civil Engineer. Image: New Civil Engineer]
Related Articles
Viaduct Inspections Show Settlement Problems Long Before Tunneling
Historic Pennsylvania Tunnel Reopens with Help From NCFI’s TerraThane Polyurethane Foam
MOUNT AIRY, NC—A $2 million tunnel construction project on the Great Alleghany Passage (GAP) is reopened to the public with help from a geotechnical polyurethane foam called TerraThane, by US company, NCFI Polyurethanes.
The GAP rail-trail is 150 miles of hiking and biking between Cumberland, Md, and Pittsburgh, Pa. created along the former railway line. In Cumberland, the GAP joins the C&O Canal Towpath, creating a continuous 335-mile long trail experience all the way to Washington, DC. It’s become a favorite biking destination for people from around the Mid-Atlantic states. One of its main tunnels, the Pinkerton Tunnel, an 849-foot former Western Maryland Railway tunnel, has been closed since 1975 due to erosion and unstable conditions. The Allegheny Trail Alliance, the organization that built and now maintains the 150-mile GAP, and the Somerset County Rails-to-Trails Association (SCRTA), wanted the tunnel reopened and helped fund the project.
[Editor] Click through for the rest of the press release from GeoPrac sponsor, NCFI Polyurethanes (makers of TerraThane). [/Editor]
Devil’s Slide Breakthrough Video and Links
The “breakthrough” media event for CALTRANS’ Devil’s Slide Tunnel project was this past Friday. A large crowd of politicians, news crews and locals were on hand as a road-header broke through a shotcrete face in a ceremony to mark the completion of the excavation portion of the first of two tunnels. It will still be over a year until the tunnels are opened to traffic. The second tunnel is expected to breakthrough as early as this week. (Photo by SFGate.com)
Caltrans tunnel punch-through from Barry Parr on Vimeo.
The Video came from the Coastsider, the page also has comments from the videographer, Barry Parr, which offer a good perspective on the event.
Click on through for more links etc.