This is a cool time-lapse video of a DeWind one-pass trencher installing 350 linear feet of 25′ foot deep Groundwater Collection (HDPE slotted 4″ pipe backfilled to grade with pea stone) in a single pass under the water table in a single pass. Their method and technology did not require any dewatering, shoring, or open excavations. [Source: YouTube via Read more about this interesting technology and company at DeWind’s website. Image: YouTube]
Related Articles
Video of DeWind One Pass Trenching MT2000 Trencher Installing Soil Bentonite Cutoff Wall
August 4, 2015
rockman
Available Resources
Comments Off on Video of DeWind One Pass Trenching MT2000 Trencher Installing Soil Bentonite Cutoff Wall
The May/June issue of Deep Foundations Magazine is now available online
July 5, 2017
rockman
Available Resources, News
Comments Off on The May/June issue of Deep Foundations Magazine is now available online