• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
  • [ August 16, 2026 ] Upcoming Webinar Looks at Engineering Concerns About Polyurethane Injection Available Resources
  • [ August 16, 2026 ] RSSeismic Adds Python Scripting and New Site-Response Capabilities Software Updates
HomeNewsMiscellaneousWorld Trade Center Slurry Wall to Become Part of Museum

World Trade Center Slurry Wall to Become Part of Museum

April 28, 2008 rockman Miscellaneous Comments Off on World Trade Center Slurry Wall to Become Part of Museum

 

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • 9/11
  • retaining wall
  • shoring
  • slurry wall
  • tiebacks
  • World Trade Center
Previous

TBM Stuck on Pittsburgh North Short Connector Project

Next

Earth Fissures in the News

Related Articles

Redi-Rock retaining walls look fantastic in residential development applications
Available Resources

Video: New Redi-Rock Design Resource Manual Available

March 7, 2016 rockman Available Resources Comments Off on Video: New Redi-Rock Design Resource Manual Available

The Redi-Rock Design Resource Manual or DRM has everything you would need to design a Redi-Rock retaining wall, including block sizes, design charts, construction details, and setback options.  The manual also includes case studies and […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
3D model of basement excavation support for Tower on Milan Square in Stuttgart, courtesy of Ground Engineering magazine
Project Related

Complex 3D Analysis for Stuttgart High-Rise

January 6, 2022 rockman Project Related Comments Off on Complex 3D Analysis for Stuttgart High-Rise

3D modeling and analysis including Plaxis 3D allows design of complex basement excavation shoring system in Stuttgart, Germany. […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
The developers 17-story apartment building is near completion
Failures

Developer To Pay Building Owner $3.2 Million For Damage Related to Shoring

April 10, 2014 rockman Failures Comments Off on Developer To Pay Building Owner $3.2 Million For Damage Related to Shoring

A developer will pay $3.2 million in damages plus $3.9 million in legal fees and expenses to the owner of a property that sustained structural damage related to the shoring of the developer’s adjacent 17 […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Business centre on Krasnoselskaya. Moscow, Nizhnaya Krasnoselskaya str. Retaining systems-secant piles, sheet-pile, bracing and excavation.
  • Vasan Srinivasan - New COO of GEI
  • Oregon car thief's escape plot foiled by landslide
  • Figure 1 This cut slope in massive, unfractuired conglomerate was smooth blasted. Treatment consisted of only drill trace removal on the main slope, but ledges were cut in natural boulder lenses at the cut end where similar features are in the adjoining natural terrain.
  • Marc Basnight Bridge in the Outer Banks, North Carolina
  • Dinosaurs vs Volcano - Jurassic World: Fallen Kingdom; © Universal Pictures, Fair Use
  • chilliwack_bc_landslide_neighborhood
  • Robert Thompson, D.GE
  • Soccer fail
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post