In an August 2010 article in ADSC’s Foundation Drilling Magazine, Eric Loehr and Dan Brown of Dan Brown and Associates summarized the key findings from a report they authored on the use of micropiles in […]
Drilled shafts have been installed by Malcolm Drilling to form the secant pile retaining walls to support the 400 ft x 80 ft x 80 ft launch pit for the SR 99 tunnel boring machine […]
Not in the metaphysical sense, but in terms of issues related to drilled shafts. Check out the survey on their homepage.
Copyright © 2007-2020 by Randy Post
