• Twitter
  • Facebook
  • LinkedIn
  • YouTube
GeoPrac.net

Our Sponsors

  • Home
  • About
    • Our Sponsors
  • Articles
  • News
    • Search By Tag
  • AI Prompt Library
    • Submit an AI Prompt
  • Resources
    • Links
  • Contact Us
News Ticker
  • [ October 11, 2026 ] Hexagon to Acquire Rocscience in a Big Geotechnical Software Deal Comings and Goings
  • [ October 11, 2026 ] Weekend CUP: Catching Up on Geotechnical News for October 2026 Weekend CUP
  • [ August 23, 2026 ] Living Below an Unstable Alpine Slope Geologic Hazards
  • [ August 23, 2026 ] Remembering J. Michael Duncan, a Geotechnical Engineering Legend In Memoriam
  • [ August 16, 2026 ] DFI Webinar to Cover Transmission-Line Structures and Foundation Requirements Available Resources
HomeNewsAvailable ResourcesYucca Mountain – $32 Billion More

Yucca Mountain – $32 Billion More

July 17, 2008 rockman Available Resources Comments Off on Yucca Mountain – $32 Billion More

 

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
  • DOE
  • nuclear waste
  • Yucca Mountain
Previous

ArcGIS API for Google Maps

Next

Download Update: VBA and Excel…Part 2

Related Articles

Regional

Finland’s Nuclear Waste Storage Plans

April 1, 2008 rockman Regional Comments Off on Finland’s Nuclear Waste Storage Plans

As the U.S. continues to fight over hurdles for its Yucca Mountain Nuclear Waste repository, Finland is on track to become the first country with a permanent storage facility for spent fuel rods from nuclear reactors. Their Onkalo tunnel, on the western coast of Finland will eventually stretch for 5-km (2-miles) and reach a depth of 500-m (1,600-ft) in solid granite bedrock. Once at depth a grid of horizontal tunnels will be constructed. Vertical storage holes will be excavated in these horizontal shafts, and the spent rods, encased in steel cannisters with copper corrosion protection, will be placed on layers of bentonite clay. The clay will cushion the cannisters and protect them against long term geologic movement. The clay also serves as a barrier to water, swelling in its presence to seal off any cracks or conduits for water that could potentially transport nuclear contamination in the distant future if the primary measures of protection are compromised. The tunnels will eventually be backfilled with bentonite and rock. The facility is projected to open in approximately 15 years at a cost of about 3 billion euros. The projected life of the facility is through 2100.  Links after the break. (Illustration by BBC)  

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
The tunnels of the Bure laboratory are still being carved out of the 150 million-year-old rock.
Miscellaneous

France starts on nuclear waste storage project

August 16, 2010 rockman Miscellaneous Comments Off on France starts on nuclear waste storage project

Apparently the French are working on their nuclear waste storage facility, they already have a research laboratory constructed about 1/2-km underground. The actual repository will come on line around 2025 and be one of the […]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr
Geologic Hazards

USDOE Problems With [Not] Storing Nuclear Waste

February 18, 2008 rockman Geologic Hazards Comments Off on USDOE Problems With [Not] Storing Nuclear Waste

More problems for the US Department of Energy related to the Yucca Mountain Nuclear Waste Repository. The New York Times is reporting that the DOE is already 10 years behind in a commitment made to Power Companies to store their nuclear waste, and according to the DOE, it will likely be at least another 10 years before they are able to begin accepting waste for permanent storage. Who cares you ask? Well, the US has already payed out $342 million in 60 lawsuits filed by utility companies, and that total could reach $11 billion according to government estimates or $35 billion according to industry estimates before Yucca Mountain finaly opens and begins accepting waste. Source: New York Times by way of Ontario-geofish.

[…]

Share this:

  • Tweet
  • Email a link to a friend (Opens in new window) Email
  • Share on Threads (Opens in new window) Threads
  • Share on Reddit (Opens in new window) Reddit
  • Share on WhatsApp (Opens in new window) WhatsApp
  • More
  • Share on Tumblr

Our Sponsors

Upcoming Events

Check out these upcoming events for geoprofessionals! You can submit your own events, or go to calendar view as well.

Our Sponsors

Random Post by Image (Feeling Lucky?)

  • Erik Loehr
  • Gèotechnique geotechnical journal
  • American Society of Testing Materials Logo - ASTM
  • Cross-section of dam repaired with geotextile
  • ESdat
  • WSP and Golder
  • Analyzing a Pile Stabilized Slope - From Rocscience
  • Geocell was used to create a steep ski jump in-run at the Utah Olympic Park in Park City, UT
Follow on Facebook
Recent Comments
  • Randy Post on Video of Highway 101 Landslide in California
  • GE Reviewer on San Francisco Millennium Tower Has Settled 16 Inches
  • Agus on New FHWA Soil Nail Manual Addresses LRFD, Hollow Bars
  • geoengineer Spain on Engineering Geologists vs Geological Engineers vs Geotechnical Engineers
  • Blaine J. Guidry, P.E. on A Whole Lotta Shakin’ Goin’ On: Center for Geotechnical Modeling Facilitates Seismic Research

Copyright © 2007-2020 by Randy Post