Congratulations to Crux Subsurface, Inc. on winning the Deep Foundation Institute’s (DFI) 2014 Outstanding Project Award (OPA) and the 2014 C. William Bermingham Innovation Award for their Sunrise Powerlink Project in California. The project involved the installation of over 3,700 micropiles for the foundations of new steel lattice towers for a 117 mile transmission line running from Imperial Valley to San Diego. All of the micopiles were installed using rigs and equipment mobilized by helicopter in the difficult terrain. The project was the first to use Crux’ patented steel micropile cap, which is what they were awarded the Bermingham Innovation Award for. Crux credits the steel cap design for reducing the on-site construction time by 64%. [Source: Read more about the awards from the Deep Foundations Institute (DFI). Image: Crux Subsurface, Inc.]
Related Articles
Micropile & Anchored Earth Retention Safety Video
January 26, 2017
rockman
Available Resources
Comments Off on Micropile & Anchored Earth Retention Safety Video
CONTECH Announces 14% Price Increase for Prefabricated Truss Bridge Structures
July 6, 2010
rockman
Press Releases
Comments Off on CONTECH Announces 14% Price Increase for Prefabricated Truss Bridge Structures
DFI Rumble: Numerical Modeler vs. Skeptic
October 31, 2022
rockman
Available Resources
Comments Off on DFI Rumble: Numerical Modeler vs. Skeptic